Hi
I have two clusters with both EVC enabled and planning to move hosts from old cluster to new cluster.
Old cluster (EVC mode baseline Intel "Merom" Generation (Intel Xeon Core 2) )
6 x IBM x3850 X5
New cluster with new hardware (EVC mode baseline Intel "Nehalem" Generation or Intel "Westmere" Generation )
6 x IBM x3850 X5
What approach is recommended, so I can move old hosts from old cluster with lower EVC baseline to new cluster with higher EVC baseline, with ZERO virtual machine downtime?
After moving all old hosts to new cluster, I'm planning to vmotion all VMs to new ESXi hosts and disconnect/remove old hosts from the cluster.