Hi again,
yet again i was testing multiple upgrade paths. Last night i've set up 3 upgrades the same time. Shouldn't be a problem, cause night before 9 at the same time were running.
Anyway... 2 were successful, one failed. The failed one was doing rollback and entirely removed vCenter. Why?
Image and logs attached.
Thanks for help.